Hancock-Wood
Touchstone Energy®
Saving Energy
Electricity & Safety
Events
Membership Benefits
Billing Options
Community Involvement
Economic Development
Publications
About HWE
Engineering



Prism Propane
ENERGY SAVING PROGRAM

You can qualify for more than $1,000 in incentives with HWE's Responsible Resource Home Program. > more







History   |   What is a Co-op?   |   Seven Cooperative Principles   |   Touchstone Energy®
Trustees & Elections   |   Patronage Capital  |   Where do you get your power?   |   Employment   |   Directions

latest construction photos

Wed., Apr. 30, 2008

The 180' communications tower is carefully assembled.

 

 

Fri., Apr. 25, 2008

The customer service counter is getting prepped for action.

Restroom tile work is taking place this week.

Exterior brick work gives the building a finished look.

The shiny, expansive warehouse floor still awaits concrete in some areas.

 

 

Thur., Apr. 17, 2008

Painting is taking place all throughout the building, including the lobby atrium.

 

 

Wed., Apr. 16, 2008

Smooth concrete dries in the warehouse.

 

 

Wed., Apr. 9, 2008

Work on the geothermal floor continues.

 

 

Mon., Apr. 7, 2008

Brick is added to the building's exterior

 

 

Thur., Apr. 3, 2008

The foundation for the communications tower is poured.

Beautiful stone columns adorn the office atrium area.

 

 

Wed., Apr. 2, 2008

Geothermal coils await a massive concrete pour.

 

 

Fri., Mar. 14, 2008

The community room will have plenty of space.

The engineering and operations area is being built inside the warehouse portion of the building, with a loft storage area on top.

 

 

Thur., Mar. 13, 2008

The office roof is getting some extra attention these days.

 

 

Tue., Mar. 11, 2008

The main entrance gets glass.

The engineering & operations portion of the building.

 

 

Thur., Feb. 28, 2008

Some of the offices already have drywall, while this one awaits it.

A look inside the sunny and open office atrium area, which is a great work staging area at the moment.

The community room is coming along nicely.

The engineering and operations offices inside the warehouse are being pieced together.

 

 

Tue., Feb. 12, 2008

The information technology storage area.

The center portion of our office building, where cubicles will be located.

This is a view of the front entrance with the community room to the right.

The front entrance looking toward the Prism Propane teller area.

 

 

Tue., Feb. 5, 2008

The roof on the warehouse is being pieced together.

 

 

Thur., Jan. 24, 2008

The warehouse walls are going up (this is the east wall).

The main office roof work is moving along.  This was taken from the eventual employee parking lot, looking toward the northwest.

 

 

Wed., Jan. 16, 2008

An overhead snowy view of our grounds.

Steel roofing is one of the main focuses right now.

Taken from about where the community room will be located, this looks toward the west.

Looking to the north toward the lobby and atrium area.

 

 

Mon., Jan. 14, 2008

The distinctive lobby entry awaits the next step.

Warehouse steel is added daily.

 

 

Mon., Jan. 7, 2008

The warehouse looking toward the north, with the office building on the right.

The south wall of the office; this picture was taken from the eventual employee parking lot.

 

 

Wed., Dec. 12, 2007

The lobby atrium begins to take shape.

 

 

Thur., Dec. 6, 2007

The office portion is on the right, and the warehouse is on the left.

An overhead view of our pond with the geothermal loops at the bottom.  As you can see, Mother Nature filled the pond a little bit, then froze it.

A look inside the office; the main lobby is on the left side of the picture.

A view of the warehouse from the north wall, looking to the south.

 

 

Fri., Nov. 9, 2007

A view of where the main entrance will be situated.

Looking toward the northwest corner of the building.

 

 

Tue., Oct. 30, 2007

Walls are starting to rise out of the ground.

 

 

Thur., Oct. 25, 2007

Frames are formed along various parts of the walls.

 

 

Thur., Oct. 18, 2007

Crews set the ICFs in place, forming the wall perimeter.

 

 

Mon., Oct. 15, 2007

The dust was flying as high as the trees recently.

 

 

Tue., Oct. 9, 2007

A birds-eye view of the pond, which will be about 12' deep.

The surface on the left is the outline of the office and warehouse, while the one of the right will be the parking lot.

 

 

Fri., Oct. 5, 2007

The office foundation is being poured.

Temporary electrical service is already up.

 

 

Mon., Sept. 24, 2007

A bulldozer makes way for the 2-acre pond.

Plenty of heavy machinery have been preparing the ground for action.

 

 

Tue., Sept. 11, 2007 - Official groundbreaking

A sign points to the future, with the groundbreaking tent in the background.

President & CEO George Walton addresses the crowd.

Many enthusiastic members, local officials, employees and friends witness the dawn of a new era in company history.

A view of the tent from high above.

Building architect Jim Malcolm discusses his design work with Clouse Contractors Lenny Clouse (L) and Bruce Shook in the background.

The ground is officially broken!

 

 

Fri., Aug. 31, 2007

Our new property entrance taken from CR 589 and facing to the west.

Facing to the northeast toward Love's Travel Stop.

2451 Grant Road, PO Box 190, North Baltimore Ohio 45872-0190   |   800-445-4840   |   Fax 419-257-3024
© Copyright 2004 Hancock-Wood Electric Cooperative, Inc.
Terms   |   Privacy   |   Contact Us   |   Site Map   |   Home
<